change-order-manager

Manage the complete change order lifecycle from potential change identification through approval and payment. Track cost and schedule impacts, maintain documentation, and provide analytics for project control.

Safety Notice

This listing is imported from skills.sh public index metadata. Review upstream SKILL.md and repository scripts before running.

Copy this and send it to your AI assistant to learn

Install skill "change-order-manager" with this command: npx skills add datadrivenconstruction/ddc_skills_for_ai_agents_in_construction/datadrivenconstruction-ddc-skills-for-ai-agents-in-construction-change-order-manager

Change Order Manager

Overview

Manage the complete change order lifecycle from potential change identification through approval and payment. Track cost and schedule impacts, maintain documentation, and provide analytics for project control.

Change Order Workflow

┌─────────────────────────────────────────────────────────────────┐ │ CHANGE ORDER WORKFLOW │ ├─────────────────────────────────────────────────────────────────┤ │ │ │ Identify → Document → Price → Negotiate → Execute │ │ ──────── ──────── ───── ───────── ─────── │ │ 📋 PCO 📝 RFP 💰 Quote 🤝 Review ✅ Approve │ │ 🔍 Review 📸 Photos ⏰ Time 📧 Submit 📄 Sign │ │ 📧 Notify 📄 Backup 📊 Impact 💬 Discuss 💵 Pay │ │ │ └─────────────────────────────────────────────────────────────────┘

Technical Implementation

from dataclasses import dataclass, field from typing import List, Dict, Optional from datetime import datetime, timedelta from enum import Enum import json

class ChangeOrderStatus(Enum): DRAFT = "draft" SUBMITTED = "submitted" UNDER_REVIEW = "under_review" PRICING = "pricing" NEGOTIATING = "negotiating" APPROVED = "approved" REJECTED = "rejected" EXECUTED = "executed" VOID = "void"

class ChangeType(Enum): OWNER_DIRECTED = "owner_directed" DESIGN_ERROR = "design_error" FIELD_CONDITION = "field_condition" CODE_CHANGE = "code_change" VALUE_ENGINEERING = "value_engineering" SCHEDULE_ACCELERATION = "schedule_acceleration" SCOPE_REDUCTION = "scope_reduction"

class PricingMethod(Enum): LUMP_SUM = "lump_sum" UNIT_PRICE = "unit_price" TIME_AND_MATERIALS = "time_and_materials" COST_PLUS = "cost_plus"

@dataclass class CostBreakdown: labor: float = 0.0 materials: float = 0.0 equipment: float = 0.0 subcontractor: float = 0.0 overhead: float = 0.0 profit: float = 0.0 bond: float = 0.0

@property
def direct_cost(self) -> float:
    return self.labor + self.materials + self.equipment + self.subcontractor

@property
def total(self) -> float:
    return self.direct_cost + self.overhead + self.profit + self.bond

@dataclass class ChangeOrderItem: id: str description: str quantity: float unit: str unit_price: float total_price: float spec_section: str = "" csi_code: str = ""

@dataclass class ChangeOrder: id: str number: int title: str description: str change_type: ChangeType status: ChangeOrderStatus

# Dates
identified_date: datetime
submitted_date: Optional[datetime] = None
approved_date: Optional[datetime] = None
executed_date: Optional[datetime] = None

# Pricing
pricing_method: PricingMethod = PricingMethod.LUMP_SUM
proposed_amount: float = 0.0
approved_amount: float = 0.0
cost_breakdown: CostBreakdown = field(default_factory=CostBreakdown)
line_items: List[ChangeOrderItem] = field(default_factory=list)

# Schedule
proposed_time_days: int = 0
approved_time_days: int = 0
impacts_critical_path: bool = False

# Documentation
rfi_references: List[str] = field(default_factory=list)
drawing_references: List[str] = field(default_factory=list)
photo_attachments: List[str] = field(default_factory=list)
backup_documents: List[str] = field(default_factory=list)

# Tracking
created_by: str = ""
assigned_to: str = ""
notes: List[Dict] = field(default_factory=list)

@dataclass class ChangeOrderLog: project_id: str project_name: str original_contract: float change_orders: List[ChangeOrder] total_approved: float total_pending: float revised_contract: float

class ChangeOrderManager: """Manage construction change orders."""

# Default markup rates
DEFAULT_MARKUPS = {
    "overhead": 0.10,  # 10%
    "profit": 0.10,    # 10%
    "bond": 0.01,      # 1%
}

def __init__(self, project_id: str, project_name: str,
             original_contract: float):
    self.project_id = project_id
    self.project_name = project_name
    self.original_contract = original_contract
    self.change_orders: Dict[str, ChangeOrder] = {}
    self.next_number = 1
    self.markup_rates = dict(self.DEFAULT_MARKUPS)

def set_markup_rates(self, overhead: float = None, profit: float = None,
                    bond: float = None):
    """Set markup rates for cost calculations."""
    if overhead is not None:
        self.markup_rates["overhead"] = overhead
    if profit is not None:
        self.markup_rates["profit"] = profit
    if bond is not None:
        self.markup_rates["bond"] = bond

def create_change_order(self, title: str, description: str,
                       change_type: ChangeType,
                       created_by: str = "") -> ChangeOrder:
    """Create new change order."""
    co_id = f"CO-{self.project_id}-{self.next_number:04d}"

    co = ChangeOrder(
        id=co_id,
        number=self.next_number,
        title=title,
        description=description,
        change_type=change_type,
        status=ChangeOrderStatus.DRAFT,
        identified_date=datetime.now(),
        created_by=created_by
    )

    self.change_orders[co_id] = co
    self.next_number += 1

    return co

def add_line_item(self, co_id: str, description: str,
                 quantity: float, unit: str, unit_price: float,
                 spec_section: str = "", csi_code: str = "") -> ChangeOrderItem:
    """Add line item to change order."""
    if co_id not in self.change_orders:
        raise ValueError(f"Change order {co_id} not found")

    co = self.change_orders[co_id]

    item_id = f"{co_id}-{len(co.line_items)+1:03d}"
    item = ChangeOrderItem(
        id=item_id,
        description=description,
        quantity=quantity,
        unit=unit,
        unit_price=unit_price,
        total_price=quantity * unit_price,
        spec_section=spec_section,
        csi_code=csi_code
    )

    co.line_items.append(item)

    # Update totals
    self._recalculate_totals(co)

    return item

def set_cost_breakdown(self, co_id: str, labor: float = 0,
                      materials: float = 0, equipment: float = 0,
                      subcontractor: float = 0) -> CostBreakdown:
    """Set cost breakdown and calculate markups."""
    if co_id not in self.change_orders:
        raise ValueError(f"Change order {co_id} not found")

    co = self.change_orders[co_id]

    direct = labor + materials + equipment + subcontractor

    co.cost_breakdown = CostBreakdown(
        labor=labor,
        materials=materials,
        equipment=equipment,
        subcontractor=subcontractor,
        overhead=direct * self.markup_rates["overhead"],
        profit=direct * self.markup_rates["profit"],
        bond=direct * self.markup_rates["bond"]
    )

    co.proposed_amount = co.cost_breakdown.total

    return co.cost_breakdown

def _recalculate_totals(self, co: ChangeOrder):
    """Recalculate change order totals from line items."""
    if co.line_items:
        direct_cost = sum(item.total_price for item in co.line_items)

        co.cost_breakdown.labor = direct_cost * 0.4  # Estimate
        co.cost_breakdown.materials = direct_cost * 0.4
        co.cost_breakdown.equipment = direct_cost * 0.1
        co.cost_breakdown.subcontractor = direct_cost * 0.1

        co.cost_breakdown.overhead = direct_cost * self.markup_rates["overhead"]
        co.cost_breakdown.profit = direct_cost * self.markup_rates["profit"]
        co.cost_breakdown.bond = direct_cost * self.markup_rates["bond"]

        co.proposed_amount = co.cost_breakdown.total

def submit_change_order(self, co_id: str) -> ChangeOrder:
    """Submit change order for review."""
    if co_id not in self.change_orders:
        raise ValueError(f"Change order {co_id} not found")

    co = self.change_orders[co_id]
    co.status = ChangeOrderStatus.SUBMITTED
    co.submitted_date = datetime.now()

    self._add_note(co, "Submitted for review")

    return co

def approve_change_order(self, co_id: str, approved_amount: float,
                        approved_time: int = 0) -> ChangeOrder:
    """Approve change order."""
    if co_id not in self.change_orders:
        raise ValueError(f"Change order {co_id} not found")

    co = self.change_orders[co_id]
    co.status = ChangeOrderStatus.APPROVED
    co.approved_date = datetime.now()
    co.approved_amount = approved_amount
    co.approved_time_days = approved_time

    self._add_note(co, f"Approved: ${approved_amount:,.2f}, {approved_time} days")

    return co

def reject_change_order(self, co_id: str, reason: str) -> ChangeOrder:
    """Reject change order."""
    if co_id not in self.change_orders:
        raise ValueError(f"Change order {co_id} not found")

    co = self.change_orders[co_id]
    co.status = ChangeOrderStatus.REJECTED

    self._add_note(co, f"Rejected: {reason}")

    return co

def execute_change_order(self, co_id: str) -> ChangeOrder:
    """Mark change order as executed."""
    if co_id not in self.change_orders:
        raise ValueError(f"Change order {co_id} not found")

    co = self.change_orders[co_id]
    if co.status != ChangeOrderStatus.APPROVED:
        raise ValueError("Change order must be approved before execution")

    co.status = ChangeOrderStatus.EXECUTED
    co.executed_date = datetime.now()

    self._add_note(co, "Executed")

    return co

def _add_note(self, co: ChangeOrder, text: str):
    """Add note to change order."""
    co.notes.append({
        "timestamp": datetime.now().isoformat(),
        "text": text
    })

def add_reference(self, co_id: str, ref_type: str, reference: str):
    """Add reference document to change order."""
    if co_id not in self.change_orders:
        raise ValueError(f"Change order {co_id} not found")

    co = self.change_orders[co_id]

    if ref_type == "rfi":
        co.rfi_references.append(reference)
    elif ref_type == "drawing":
        co.drawing_references.append(reference)
    elif ref_type == "photo":
        co.photo_attachments.append(reference)
    elif ref_type == "backup":
        co.backup_documents.append(reference)

def get_summary(self) -> Dict:
    """Get change order summary statistics."""
    total_approved = sum(
        co.approved_amount for co in self.change_orders.values()
        if co.status in [ChangeOrderStatus.APPROVED, ChangeOrderStatus.EXECUTED]
    )

    total_pending = sum(
        co.proposed_amount for co in self.change_orders.values()
        if co.status in [ChangeOrderStatus.SUBMITTED, ChangeOrderStatus.UNDER_REVIEW,
                        ChangeOrderStatus.PRICING, ChangeOrderStatus.NEGOTIATING]
    )

    by_type = {}
    for co in self.change_orders.values():
        t = co.change_type.value
        by_type[t] = by_type.get(t, 0) + (co.approved_amount or co.proposed_amount)

    by_status = {}
    for co in self.change_orders.values():
        s = co.status.value
        by_status[s] = by_status.get(s, 0) + 1

    return {
        "original_contract": self.original_contract,
        "total_approved": total_approved,
        "total_pending": total_pending,
        "revised_contract": self.original_contract + total_approved,
        "change_order_count": len(self.change_orders),
        "change_percentage": (total_approved / self.original_contract * 100) if self.original_contract else 0,
        "by_type": by_type,
        "by_status": by_status
    }

def generate_log(self) -> str:
    """Generate change order log."""
    summary = self.get_summary()

    lines = [
        "# Change Order Log",
        "",
        f"**Project:** {self.project_name}",
        f"**Date:** {datetime.now().strftime('%Y-%m-%d')}",
        "",
        "## Summary",
        "",
        f"| Metric | Amount |",
        f"|--------|--------|",
        f"| Original Contract | ${summary['original_contract']:,.2f} |",
        f"| Approved Changes | ${summary['total_approved']:,.2f} |",
        f"| Pending Changes | ${summary['total_pending']:,.2f} |",
        f"| **Revised Contract** | **${summary['revised_contract']:,.2f}** |",
        f"| Change % | {summary['change_percentage']:.1f}% |",
        "",
        "## Change Orders",
        "",
        "| # | Title | Type | Status | Proposed | Approved | Time |",
        "|---|-------|------|--------|----------|----------|------|"
    ]

    for co in sorted(self.change_orders.values(), key=lambda x: x.number):
        lines.append(
            f"| {co.number} | {co.title[:30]} | {co.change_type.value} | "
            f"{co.status.value} | ${co.proposed_amount:,.0f} | "
            f"${co.approved_amount:,.0f} | {co.approved_time_days}d |"
        )

    return "\n".join(lines)

def generate_co_document(self, co_id: str) -> str:
    """Generate formal change order document."""
    if co_id not in self.change_orders:
        return "Change order not found"

    co = self.change_orders[co_id]

    lines = [
        f"# CHANGE ORDER NO. {co.number}",
        "",
        f"**Project:** {self.project_name}",
        f"**Change Order ID:** {co.id}",
        f"**Date:** {co.submitted_date.strftime('%Y-%m-%d') if co.submitted_date else 'Draft'}",
        "",
        "---",
        "",
        f"## Description of Change",
        "",
        co.description,
        "",
        f"**Type:** {co.change_type.value.replace('_', ' ').title()}",
        "",
    ]

    if co.line_items:
        lines.extend([
            "## Schedule of Values",
            "",
            "| Item | Description | Qty | Unit | Unit Price | Total |",
            "|------|-------------|-----|------|------------|-------|"
        ])
        for item in co.line_items:
            lines.append(
                f"| {item.id} | {item.description} | {item.quantity} | "
                f"{item.unit} | ${item.unit_price:,.2f} | ${item.total_price:,.2f} |"
            )
        lines.append("")

    lines.extend([
        "## Cost Summary",
        "",
        f"| Category | Amount |",
        f"|----------|--------|",
        f"| Labor | ${co.cost_breakdown.labor:,.2f} |",
        f"| Materials | ${co.cost_breakdown.materials:,.2f} |",
        f"| Equipment | ${co.cost_breakdown.equipment:,.2f} |",
        f"| Subcontractor | ${co.cost_breakdown.subcontractor:,.2f} |",
        f"| Overhead | ${co.cost_breakdown.overhead:,.2f} |",
        f"| Profit | ${co.cost_breakdown.profit:,.2f} |",
        f"| Bond | ${co.cost_breakdown.bond:,.2f} |",
        f"| **Total** | **${co.cost_breakdown.total:,.2f}** |",
        "",
        f"## Time Impact",
        "",
        f"Proposed Extension: **{co.proposed_time_days} days**",
        f"Critical Path Impact: {'Yes' if co.impacts_critical_path else 'No'}",
        "",
    ])

    if co.rfi_references:
        lines.extend([
            "## References",
            "",
            f"- RFIs: {', '.join(co.rfi_references)}",
            f"- Drawings: {', '.join(co.drawing_references)}" if co.drawing_references else "",
        ])

    return "\n".join(lines)

Quick Start

Initialize manager

manager = ChangeOrderManager( project_id="PRJ-001", project_name="Office Tower", original_contract=5000000.0 )

Create change order

co = manager.create_change_order( title="Additional Structural Steel", description="Add steel reinforcement at Level 5 per RFI-042", change_type=ChangeType.DESIGN_ERROR, created_by="Project Manager" )

Add line items

manager.add_line_item( co.id, "W12x26 Steel Beam", quantity=450, unit="LF", unit_price=85.00, csi_code="05 12 00" )

Or set cost breakdown directly

manager.set_cost_breakdown( co.id, labor=15000, materials=25000, equipment=2000, subcontractor=5000 )

Add references

manager.add_reference(co.id, "rfi", "RFI-042") manager.add_reference(co.id, "drawing", "S-501 Rev 2")

Submit for approval

manager.submit_change_order(co.id)

Approve (with negotiated amount)

manager.approve_change_order(co.id, approved_amount=50000, approved_time=5)

Generate documents

print(manager.generate_co_document(co.id)) print(manager.generate_log())

Requirements

pip install (no external dependencies)

Source Transparency

This detail page is rendered from real SKILL.md content. Trust labels are metadata-based hints, not a safety guarantee.

Related Skills

Related by shared tags or category signals.

Automation

drawing-analyzer

No summary provided by upstream source.

Repository SourceNeeds Review
Automation

dwg-to-excel

No summary provided by upstream source.

Repository SourceNeeds Review
Automation

cost-estimation-resource

No summary provided by upstream source.

Repository SourceNeeds Review
Automation

daily-progress-report

No summary provided by upstream source.

Repository SourceNeeds Review