Risk Management Specialist
ISO 14971:2019 risk management implementation throughout the medical device lifecycle.
Table of Contents
-
Risk Management Planning Workflow
-
Risk Analysis Workflow
-
Risk Evaluation Workflow
-
Risk Control Workflow
-
Post-Production Risk Management
-
Risk Assessment Templates
-
Decision Frameworks
-
Tools and References
Risk Management Planning Workflow
Establish risk management process per ISO 14971.
Workflow: Create Risk Management Plan
-
Define scope of risk management activities:
-
Medical device identification
-
Lifecycle stages covered
-
Applicable standards and regulations
-
Establish risk acceptability criteria:
-
Define probability categories (P1-P5)
-
Define severity categories (S1-S5)
-
Create risk matrix with acceptance thresholds
-
Assign responsibilities:
-
Risk management lead
-
Subject matter experts
-
Approval authorities
-
Define verification activities:
-
Methods for control verification
-
Acceptance criteria
-
Plan production and post-production activities:
-
Information sources
-
Review triggers
-
Update procedures
-
Obtain plan approval
-
Establish risk management file
-
Validation: Plan approved; acceptability criteria defined; responsibilities assigned; file established
Risk Management Plan Content
Section Content Evidence
Scope Device and lifecycle coverage Scope statement
Criteria Risk acceptability matrix Risk matrix document
Responsibilities Roles and authorities RACI chart
Verification Methods and acceptance Verification plan
Production/Post-Production Monitoring activities Surveillance plan
Risk Acceptability Matrix (5x5)
Probability \ Severity Negligible Minor Serious Critical Catastrophic
Frequent (P5) Medium High High Unacceptable Unacceptable
Probable (P4) Medium Medium High High Unacceptable
Occasional (P3) Low Medium Medium High High
Remote (P2) Low Low Medium Medium High
Improbable (P1) Low Low Low Medium Medium
Risk Level Actions
Level Acceptable Action Required
Low Yes Document and accept
Medium ALARP Reduce if practicable; document rationale
High ALARP Reduction required; demonstrate ALARP
Unacceptable No Design change mandatory
Risk Analysis Workflow
Identify hazards and estimate risks systematically.
Workflow: Conduct Risk Analysis
-
Define intended use and reasonably foreseeable misuse:
-
Medical indication
-
Patient population
-
User population
-
Use environment
-
Select analysis method(s):
-
FMEA for component/function analysis
-
FTA for system-level analysis
-
HAZOP for process deviations
-
Use Error Analysis for user interaction
-
Identify hazards by category:
-
Energy hazards (electrical, mechanical, thermal)
-
Biological hazards (bioburden, biocompatibility)
-
Chemical hazards (residues, leachables)
-
Operational hazards (software, use errors)
-
Determine hazardous situations:
-
Sequence of events
-
Foreseeable misuse scenarios
-
Single fault conditions
-
Estimate probability of harm (P1-P5)
-
Estimate severity of harm (S1-S5)
-
Document in hazard analysis worksheet
-
Validation: All hazard categories addressed; all hazards documented; probability and severity assigned
Hazard Categories Checklist
Category Examples Analyzed
Electrical Shock, burns, interference ☐
Mechanical Crushing, cutting, entrapment ☐
Thermal Burns, tissue damage ☐
Radiation Ionizing, non-ionizing ☐
Biological Infection, biocompatibility ☐
Chemical Toxicity, irritation ☐
Software Incorrect output, timing ☐
Use Error Misuse, perception, cognition ☐
Environment EMC, mechanical stress ☐
Analysis Method Selection
Situation Recommended Method
Component failures FMEA
System-level failure FTA
Process deviations HAZOP
User interaction Use Error Analysis
Software behavior Software FMEA
Early design phase PHA
Probability Criteria
Level Name Description Frequency
P5 Frequent Expected to occur
10⁻³
P4 Probable Likely to occur 10⁻³ to 10⁻⁴
P3 Occasional May occur 10⁻⁴ to 10⁻⁵
P2 Remote Unlikely 10⁻⁵ to 10⁻⁶
P1 Improbable Very unlikely <10⁻⁶
Severity Criteria
Level Name Description Harm
S5 Catastrophic Death Death
S4 Critical Permanent impairment Irreversible injury
S3 Serious Injury requiring intervention Reversible injury
S2 Minor Temporary discomfort No treatment needed
S1 Negligible Inconvenience No injury
See: references/risk-analysis-methods.md
Risk Evaluation Workflow
Evaluate risks against acceptability criteria.
Workflow: Evaluate Identified Risks
-
Calculate initial risk level from probability × severity
-
Compare to risk acceptability criteria
-
For each risk, determine:
-
Acceptable: Document and accept
-
ALARP: Proceed to risk control
-
Unacceptable: Mandatory risk control
-
Document evaluation rationale
-
Identify risks requiring benefit-risk analysis
-
Complete benefit-risk analysis if applicable
-
Compile risk evaluation summary
-
Validation: All risks evaluated; acceptability determined; rationale documented
Risk Evaluation Decision Tree
Risk Estimated │ ▼ Apply Acceptability Criteria │ ├── Low Risk ──────────► Accept and document │ ├── Medium Risk ───────► Consider risk reduction │ │ Document ALARP if not reduced │ ▼ │ Practicable to reduce? │ │ │ Yes──► Implement control │ No───► Document ALARP rationale │ ├── High Risk ─────────► Risk reduction required │ │ Must demonstrate ALARP │ ▼ │ Implement control │ Verify residual risk │ └── Unacceptable ──────► Design change mandatory Cannot proceed without control
ALARP Demonstration Requirements
Criterion Evidence Required
Technical feasibility Analysis of alternative controls
Proportionality Cost-benefit of further reduction
State of the art Comparison to similar devices
Stakeholder input Clinical/user perspectives
Benefit-Risk Analysis Triggers
Situation Benefit-Risk Required
Residual risk remains high Yes
No feasible risk reduction Yes
Novel device Yes
Unacceptable risk with clinical benefit Yes
All risks low No
Risk Control Workflow
Implement and verify risk control measures.
Workflow: Implement Risk Controls
-
Identify risk control options:
-
Inherent safety by design (Priority 1)
-
Protective measures in device (Priority 2)
-
Information for safety (Priority 3)
-
Select optimal control following hierarchy
-
Analyze control for new hazards introduced
-
Document control in design requirements
-
Implement control in design
-
Develop verification protocol
-
Execute verification and document results
-
Evaluate residual risk with control in place
-
Validation: Control implemented; verification passed; residual risk acceptable; no unaddressed new hazards
Risk Control Hierarchy
Priority Control Type Examples Effectiveness
1 Inherent Safety Eliminate hazard, fail-safe design Highest
2 Protective Measures Guards, alarms, automatic shutdown High
3 Information Warnings, training, IFU Lower
Risk Control Option Analysis Template
RISK CONTROL OPTION ANALYSIS
Hazard ID: H-[XXX] Hazard: [Description] Initial Risk: P[X] × S[X] = [Level]
OPTIONS CONSIDERED:
| Option | Control Type | New Hazards | Feasibility | Selected |
|---|---|---|---|---|
| 1 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |
| 2 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |
SELECTED CONTROL: Option [X] Rationale: [Justification for selection]
IMPLEMENTATION:
- Requirement: [REQ-XXX]
- Design Document: [Reference]
VERIFICATION:
- Method: [Test/Analysis/Review]
- Protocol: [Reference]
- Acceptance Criteria: [Criteria]
Risk Control Verification Methods
Method When to Use Evidence
Test Quantifiable performance Test report
Inspection Physical presence Inspection record
Analysis Design calculation Analysis report
Review Documentation check Review record
Residual Risk Evaluation
After Control Action
Acceptable Document, proceed
ALARP achieved Document rationale, proceed
Still unacceptable Additional control or design change
New hazard introduced Analyze and control new hazard
Post-Production Risk Management
Monitor and update risk management throughout product lifecycle.
Workflow: Post-Production Risk Monitoring
-
Identify information sources:
-
Customer complaints
-
Service reports
-
Vigilance/adverse events
-
Literature monitoring
-
Clinical studies
-
Establish collection procedures
-
Define review triggers:
-
New hazard identified
-
Increased frequency of known hazard
-
Serious incident
-
Regulatory feedback
-
Analyze incoming information for risk relevance
-
Update risk management file as needed
-
Communicate significant findings
-
Conduct periodic risk management review
-
Validation: Information sources monitored; file current; reviews completed per schedule
Information Sources
Source Information Type Review Frequency
Complaints Use issues, failures Continuous
Service Field failures, repairs Monthly
Vigilance Serious incidents Immediate
Literature Similar device issues Quarterly
Regulatory Authority feedback As received
Clinical PMCF data Per plan
Risk Management File Update Triggers
Trigger Response Time Action
Serious incident Immediate Full risk review
New hazard identified 30 days Risk analysis update
Trend increase 60 days Trend analysis
Design change Before implementation Impact assessment
Standards update Per transition period Gap analysis
Periodic Review Requirements
Review Element Frequency
Risk management file completeness Annual
Risk control effectiveness Annual
Post-market information analysis Quarterly
Risk-benefit conclusions Annual or on new data
Risk Assessment Templates
Hazard Analysis Worksheet
HAZARD ANALYSIS WORKSHEET
Product: [Device Name] Document: HA-[Product]-[Rev] Analyst: [Name] Date: [Date]
| ID | Hazard | Hazardous Situation | Harm | P | S | Initial Risk | Control | Residual P | Residual S | Final Risk |
|---|---|---|---|---|---|---|---|---|---|---|
| H-001 | [Hazard] | [Situation] | [Harm] | [1-5] | [1-5] | [Level] | [Control ref] | [1-5] | [1-5] | [Level] |
FMEA Worksheet
FMEA WORKSHEET
Product: [Device Name] Subsystem: [Subsystem] Analyst: [Name] Date: [Date]
| ID | Item | Function | Failure Mode | Effect | S | Cause | O | Control | D | RPN | Action |
|---|---|---|---|---|---|---|---|---|---|---|---|
| FM-001 | [Item] | [Function] | [Mode] | [Effect] | [1-10] | [Cause] | [1-10] | [Detection] | [1-10] | [S×O×D] | [Action] |
RPN Action Thresholds:
200: Critical - Immediate action 100-200: High - Action plan required 50-100: Medium - Consider action <50: Low - Monitor
Risk Management Report Summary
RISK MANAGEMENT REPORT
Product: [Device Name] Date: [Date] Revision: [X.X]
SUMMARY:
- Total hazards identified: [N]
- Risk controls implemented: [N]
- Residual risks: [N] Low, [N] Medium, [N] High
- Overall conclusion: [Acceptable / Not Acceptable]
RISK DISTRIBUTION:
| Risk Level | Before Control | After Control |
|---|---|---|
| Unacceptable | [N] | 0 |
| High | [N] | [N] |
| Medium | [N] | [N] |
| Low | [N] | [N] |
CONTROLS IMPLEMENTED:
- Inherent safety: [N]
- Protective measures: [N]
- Information for safety: [N]
OVERALL RESIDUAL RISK: [Acceptable / ALARP Demonstrated] BENEFIT-RISK CONCLUSION: [If applicable]
APPROVAL: Risk Management Lead: _____________ Date: _______ Quality Assurance: _____________ Date: _______
Decision Frameworks
Risk Control Selection
What is the risk level? │ ├── Unacceptable ──► Can hazard be eliminated? │ │ │ Yes─┴─No │ │ │ │ ▼ ▼ │ Eliminate Can protective │ hazard measure reduce? │ │ │ Yes─┴─No │ │ │ │ ▼ ▼ │ Add Add warning │ protection + training │ └── High/Medium ──► Apply hierarchy starting at Level 1
New Hazard Analysis
Question If Yes If No
Does control introduce new hazard? Analyze new hazard Proceed
Is new risk higher than original? Reject control option Acceptable trade-off
Can new hazard be controlled? Add control Reject control option
Risk Acceptability Decision
Condition Decision
All risks Low Acceptable
Medium risks with ALARP Acceptable
High risks with ALARP documented Acceptable if benefits outweigh
Any Unacceptable residual Not acceptable - redesign
Tools and References
Scripts
Tool Purpose Usage
risk_matrix_calculator.py Calculate risk levels and FMEA RPN python risk_matrix_calculator.py --help
Risk Matrix Calculator Features:
-
ISO 14971 5x5 risk matrix calculation
-
FMEA RPN (Risk Priority Number) calculation
-
Interactive mode for guided assessment
-
Display risk criteria definitions
-
JSON output for integration
References
Document Content
iso14971-implementation-guide.md Complete ISO 14971:2019 implementation with templates
risk-analysis-methods.md FMEA, FTA, HAZOP, Use Error Analysis methods
Quick Reference: ISO 14971 Process
Stage Key Activities Output
Planning Define scope, criteria, responsibilities Risk Management Plan
Analysis Identify hazards, estimate risk Hazard Analysis
Evaluation Compare to criteria, ALARP assessment Risk Evaluation
Control Implement hierarchy, verify Risk Control Records
Residual Overall assessment, benefit-risk Risk Management Report
Production Monitor, review, update Updated RM File
Related Skills
Skill Integration Point
quality-manager-qms-iso13485 QMS integration
capa-officer Risk-based CAPA
regulatory-affairs-head Regulatory submissions
quality-documentation-manager Risk file management